The role · 02

The work

What does an AX designer actually do all week?

OutlineRevised

The arc of an AX project

  1. Frame — is this a job for an agent at all? (See Groundwork (external site).)
  2. Map the work — current process, decisions, judgement, failure points.
  3. Design the delegation — scope, authority, autonomy per action, stop conditions.
  4. Design the handback — intent previews, receipts, escalation to people.
  5. Design the agent-facing surface — tool descriptions, errors, data contracts.
  6. Evaluate — define what "good" means, test with people and agents, measure calibration.
  7. Govern — records, oversight, review cadence. (See Accountability Lab (external site).)

What the role produces

Artefact Answers
Autonomy map Which actions may the agent take alone, and which need a person?
Delegation spec What exactly is being handed over, with what boundaries?
Agent brief / persona card Who is this agent, who does it act for, what can it touch?
Handback design How does work and control come back, and what does the person see?
Failure-mode map What goes wrong at each step, and what happens next?
Evaluation rubric How do we know the agent and the experience are good enough?

Each artefact will get a worked example in the fictional enterprise, and a downloadable template.

Who they work with

Engineers on tool design and evals; product on scope and metrics; risk and legal on authority and records; operations teams who will supervise the agent; and the people whose work is being changed.